Back to All Pools
Concrete Pool with Rockwork
Time-Tested
Concrete
Poured Construction

Concrete Pool Construction

Traditional poured concrete offers exceptional durability and can accommodate any design. Perfect for complex custom designs and structural complexity.

Why Choose Concrete Construction

Proven strength and versatility for custom pool designs

Structural Excellence

Poured concrete creates a monolithic structure with exceptional strength. Ideal for challenging sites, hillsides, and areas requiring superior structural integrity.

Architectural Freedom

Accommodate complex shapes, multiple levels, and integrated features. Concrete construction handles the most ambitious architectural visions with ease.

Climate Resilience

Performs exceptionally in all climates and soil conditions. Concrete's thermal mass and structural properties make it ideal for varying environmental conditions.

Poured Concrete Construction

Poured concrete construction involves creating custom forms and pouring liquid concrete directly into place. Unlike gunite's sprayed application, poured concrete uses traditional formwork and gravity-fed pouring, creating a dense, monolithic structure with exceptional strength.

This method is particularly well-suited for complex architectural designs, challenging terrain, and situations where maximum structural integrity is required. The poured concrete method has been used for decades in commercial and residential pool construction worldwide.

While similar to gunite in strength and durability, poured concrete offers advantages in certain architectural applications and can be more cost-effective for larger or simpler designs. The result is a pool shell that becomes one with its foundation, providing unmatched stability and longevity.

Concrete Construction Process

Precise engineering and professional installation

1
Design & Formwork Planning

Every poured concrete pool begins with meticulous planning. We design custom formwork systems that will create your exact pool shape. Complex designs require sophisticated formwork engineering to ensure proper concrete flow and consolidation.

Timeline: 3-4 weeks | Includes: Formwork design, material procurement, structural calculations

2
Foundation & Excavation

Precise excavation and foundation preparation is critical for poured concrete construction. We create perfectly level bases and install comprehensive reinforcement systems. Proper foundation work ensures the concrete cures with maximum strength and stability.

Timeline: 4-6 days | Includes: Excavation, grading, foundation preparation, drainage systems

3
Formwork Installation

Custom formwork is constructed using precision-engineered materials. For complex designs, we use modular form systems that allow for intricate shapes and features. Each form is braced and leveled to ensure perfect concrete placement.

Timeline: 3-7 days | Includes: Form assembly, bracing, waterproofing, final inspections

4
Reinforcement & Plumbing

Steel reinforcement cages are installed within the formwork, followed by all plumbing and electrical conduits. The reinforcement provides structural integrity, while proper plumbing placement ensures optimal water flow and equipment performance.

Timeline: 2-4 days | Includes: Rebar installation, plumbing systems, electrical conduits, testing

5
Concrete Pouring

High-quality concrete is carefully poured into the formwork using specialized equipment. Our team ensures proper consolidation through vibration and careful monitoring. The pour creates a seamless, monolithic structure with exceptional strength.

Timeline: 1-2 days | Includes: Concrete delivery, pouring, consolidation, initial curing

6
Curing & Form Removal

Concrete requires 28 days of proper curing to reach full strength. During this period, forms are carefully removed and initial finishing work begins. Controlled curing ensures maximum durability and prevents cracking or other issues.

Timeline: 28 days curing | Includes: Form removal, surface preparation, curing monitoring

7
Finishing & Equipment

The pool receives its final finish and all equipment is installed. This includes plaster application, tile work, decking, and the complete pool system setup. We ensure everything works perfectly before final handover.

Timeline: 2-4 weeks | Includes: Plaster/tile finish, equipment installation, decking, startup

Total Timeline: 8-12 weeks from start to finish

Technical Specifications

Engineering details that ensure lasting quality

Shell Composition

  • Thickness: 6-8 inches for standard depths, thicker for complex designs
  • Compressive Strength: 3,000-4,000 PSI (higher than typical concrete)
  • Steel Reinforcement: #4-#6 rebar on 12-18 inch centers
  • Mix Design: High-strength concrete with air entrainment

Durability & Lifespan

  • Expected Lifespan: 40-50 years with proper maintenance
  • Structural Warranty: Lifetime on shell structure
  • Finish Lifespan: 10-20 years depending on type
  • Resistance: Freeze-thaw cycles, ground movement, heavy loads

Finish Options

  • White Plaster: Classic smooth finish, 7-10 year lifespan
  • Colored Plaster: Various colors, 10-15 year lifespan
  • Pebble Finish: Textured, durable, 15-20 year lifespan
  • Tile & Stone: Premium finishes, 20+ year lifespan

Maintenance Requirements

  • Weekly: Chemical testing, brushing, skimming
  • Monthly: Filter cleaning, equipment inspection
  • Annual: Acid wash, equipment service
  • Long-term: Replaster every 10-20 years

Honest Assessment

Understanding the advantages and considerations

Advantages

  • Superior Structural Strength: Monolithic construction provides exceptional durability
  • Architectural Complexity: Handles the most challenging designs and terrain
  • Climate Versatility: Performs well in extreme weather conditions
  • Time-Tested Method: Decades of proven performance worldwide
  • Foundation Integration: Becomes one with the ground for maximum stability

Considerations

  • Extended Timeline: 8-12 weeks vs. 2-4 weeks for fiberglass
  • Higher Initial Investment: More expensive than prefabricated options
  • Complex Site Requirements: Needs proper foundation and formwork space
  • Weather Dependent: Concrete work can be affected by temperature and moisture
  • Periodic Resurfacing: Plaster needs replacement every 10-20 years

Investment & Value

Understanding the cost of superior construction

Cost Considerations

Poured concrete construction offers premium quality and versatility. While the initial investment is higher than prefabricated options, concrete pools provide exceptional long-term value through their durability and ability to accommodate complex designs.

The total cost includes engineering, custom formwork, high-quality concrete, extensive reinforcement, and specialized labor. Each project is unique, with costs varying based on design complexity, site conditions, and finish selections. We provide detailed proposals with transparent pricing for every project.

Long-Term Value

While concrete pools require a larger upfront investment, they deliver outstanding long-term value:

  • Structural Superiority: Virtually indestructible construction method
  • Architectural Capability: Can handle the most complex designs imaginable
  • Foundation Integration: Becomes part of the landscape for maximum stability
  • Climate Performance: Exceptional durability in all weather conditions

Is Concrete Right for You?

Poured concrete construction is ideal for specific situations

Perfect For

  • Complex Architectural Designs: Multi-level pools, unusual shapes, integrated features
  • Challenging Terrain: Hillsides, slopes, uneven ground, rocky sites
  • Commercial Applications: Hotels, resorts, community pools, heavy-use facilities
  • Extreme Climates: Areas with freeze-thaw cycles, heavy snow, or intense heat
  • Maximum Durability: Applications requiring the strongest possible construction

Consider Alternatives If

  • Quick Installation Needed: Fiberglass installs in days, not weeks
  • Budget Constraints: Vinyl liner offers lower initial cost
  • Simple Design: Standard rectangular shapes may not need custom concrete
  • Limited Site Access: Very tight spaces may be challenging for formwork
  • Short Timeline: Complex concrete work requires extended construction time

Ready for Time-Tested Quality?

Experience the proven strength and versatility of concrete pool construction